Arrow Research search
Back to AAAI

AAAI 2025

Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags

Conference Paper AAAI Technical Track on Planning, Routing, and Scheduling Artificial Intelligence

Abstract

This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max). Recent advances in Constraint Programming (CP) and Temporal Networks have re-invoked interest in evaluating the advantages and drawbacks of various proactive and reactive scheduling methods. First, we present a new, CP-based fully proactive method. Second, we show how a reactive approach can be constructed using an online rescheduling procedure. A third contribution is based on partial order schedules and uses Simple Temporal Networks with Uncertainty (STNUs). Our statistical analysis shows that the STNU-based algorithm performs best in terms of solution quality, while also showing good relative offline and online computation time

Authors

Keywords

No keywords are indexed for this paper.

Context

Venue
AAAI Conference on Artificial Intelligence
Archive span
1980-2026
Indexed papers
28718
Paper id
92353604497418570