Arrow Research search

Author name cluster

Esteban Freydell

Possible papers associated with this exact author name in Arrow. This page groups case-insensitive exact name matches and is not a full identity disambiguation profile.

1 paper
1 author row

Possible papers

1

AAAI Conference 2025 Conference Paper

Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags

  • Kim van den Houten
  • Léon Planken
  • Esteban Freydell
  • David M.J. Tax
  • Mathijs de Weerdt

This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max). Recent advances in Constraint Programming (CP) and Temporal Networks have re-invoked interest in evaluating the advantages and drawbacks of various proactive and reactive scheduling methods. First, we present a new, CP-based fully proactive method. Second, we show how a reactive approach can be constructed using an online rescheduling procedure. A third contribution is based on partial order schedules and uses Simple Temporal Networks with Uncertainty (STNUs). Our statistical analysis shows that the STNU-based algorithm performs best in terms of solution quality, while also showing good relative offline and online computation time