TCS 2020
On scheduling multiple two-stage flowshops
Abstract
This paper studies the problem of scheduling n two-stage jobs on m multiple two-stage flowshops, with the objective of minimizing the makespan. The problem is NP-hard even when m is a fixed constant, and becomes strongly NP-hard when m is part of the input. A 2. 6-approximation algorithm along with its analysis is presented for an arbitrary m ≥ 2. This is the first approximation algorithm for multiple flowshops when the number m of flowshops is part of the input. The fact that m is part of the input and the time complexity O ( n log n ) of the algorithm demonstrate that the problem, which plays an important role in the current research in cloud computing and data centers, can be solved efficiently with a reasonable level of satisfaction.
Authors
Keywords
Context
- Venue
- Theoretical Computer Science
- Archive span
- 1975-2026
- Indexed papers
- 16261
- Paper id
- 74516090099409403