STOC 2002
Optimal rate-based scheduling on multiprocessors
Abstract
The PD 2 Pfair/ERfair scheduling algorithm is the most efficient known algorithm for optimally scheduling periodic tasks on multiprocessors. In this paper, we prove that PD 2 is also optimal for scheduling "rate-based" tasks whose processing steps may be highly jittered. The rate-based task model we consider generalizes the widely-studied sporadic task model.
Authors
Keywords
No keywords are indexed for this paper.
Context
- Venue
- ACM Symposium on Theory of Computing
- Archive span
- 1969-2025
- Indexed papers
- 4364
- Paper id
- 975070616213077634