IJCAI 2005
Proactive Algorithms for Scheduling with Probabilistic Durations
Abstract
Proactive scheduling seeks to generate high quality solutions despite execution time uncertainty. Building on work in [Beck and Wilson, 2004], we conduct an empirical study of a number of algorithms for the job shop scheduling problem with probabilistic durations. The main contributions of this paper are: the introduction and empirical analysis of a novel constraint-based search technique that can be applied beyond probabilistic scheduling problems, the introduction and empirical analysis of a number of deterministic filtering algorithms for probabilistic job shop scheduling, and the identification of a number of problem characteristics that contribute to algorithm performance.
Authors
Keywords
No keywords are indexed for this paper.
Context
- Venue
- International Joint Conference on Artificial Intelligence
- Archive span
- 1969-2025
- Indexed papers
- 14525
- Paper id
- 408166331249366182