Arrow Research search
Back to AAAI

AAAI 2020

Using Approximation within Constraint Programming to Solve the Parallel Machine Scheduling Problem with Additional Unit Resources

Conference Paper AAAI Technical Track: Constraint Satisfaction and Optimization Artificial Intelligence

Abstract

In this paper, we consider the Parallel Machine Scheduling Problem with Additional Unit Resources, which consists in scheduling a set of n jobs on m parallel unrelated machines and subject to exactly one of r unit resources. This problem arises from the download of acquisitions from satellites to ground stations. We first introduce two baseline constraint models for this problem. Then, we build on an approximation algorithm for this problem, and we discuss about the efficiency of designing an improved constraint model based on these approximation results. In particular, we introduce new constraints that restrict search to executions of the approximation algorithm. Finally, we report experimental data demonstrating that this model significantly outperforms the two reference models.

Authors

Keywords

No keywords are indexed for this paper.

Context

Venue
AAAI Conference on Artificial Intelligence
Archive span
1980-2026
Indexed papers
28718
Paper id
213307503953040565