ICAPS Conference 2016 Conference Paper

Solving Realistic Unit Commitment Problems Using Temporal Planning: Challenges and Solutions

  • Chiara Piacentini
  • Daniele Magazzeni
  • Derek Long
  • Maria Fox 0001
  • Chris J. Dent

When facing real world planning problems, standard planners are often inadequate and enhancement of the current techniques are required. In this paper we present the challenges that we have faced in solving the Unit Commitment (UC) problem, a well-known problem in the electrical power industry for which current best methods are based on Mixed Integer Programming (MIP). Typical UC instances involve hundreds or even thousands of generating units, pushing the scalability of state of the art planners beyond their limits. Furthermore, UC is characterised by state-dependent action costs, a feature that not many domain independent planners can efficiently handle. In this paper we focus on the challenge of making domain-independent planning competitive with the MIP method on realistic-sized UC instances. We present the results of our investigation into modelling the UC problem as a temporal planning problem, and show how we scaled up from handling fewer than 10 generating units to more than 400, obtaining solutions almost as high quality as those generated by MIP. We conclude by discussing future directions for temporal planning in this domain, that lie beyond what can be modelled and solved using MIP methods.

ICAPS Conference 2013 Conference Paper

Challenge: Modelling Unit Commitment as a Planning Problem

  • Joshua Campion
  • Chris J. Dent
  • Maria Fox 0001
  • Derek Long
  • Daniele Magazzeni

Unit Commitment is a fundamental problem in power systems engineering, deciding which generating units to switch on, and when to switch them on, in order to efficiently meet anticipated demand. It has traditionally been solved as a Mixed Integer Programming (MIP) problem but upcoming changes to the power system drastically increase the MIP solution time. In this paper, we discuss the benefits that using planning may have over the established methods. We provide a formal description of Unit Commitment, and we present its formulation as MIP and as a planning problem. This is a novel and interesting application area for planning, with features that make the domain challenging for current planners.